﻿<?xml version="1.0" encoding="utf-8"?><?xml-stylesheet type="text/css" media="screen" href="/cms/includes/rss.css"?><!--RSS generated by Primary Integeration at Sun, 05 Sep 2010 01:41:33 GMT--><rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:wfw="http://wellformedweb.org/CommentAPI/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:feedburner="http://rssnamespace.org/feedburner/ext/1.0"><channel><title /><link>http://www.primaryintegration.com/news/</link><copyright /><generator>Primary Integeration</generator><item><title>PI to work with The Ranger Group on IRS Project</title><link>http://www.primaryintegration.com/news/default.aspx?ArticleId=108</link><description>PI, in conjunction with The Ranger Group (www.ranger-group.com), will be providing commissioning services for IRS.</description><content:encoded><![CDATA[PI, in conjunction with The Ranger Group (www.ranger-group.com), will be providing commissioning services for IRS.]]></content:encoded><dc:creator>Lillian,Rivera</dc:creator><pubDate>Mon, 14 Jun 2010 19:21:00 GMT</pubDate></item><item><title>PI Wins New Government Power Plant Project</title><link>http://www.primaryintegration.com/news/default.aspx?ArticleId=106</link><description>PI, in conjunction with AlbanCat, is constructing a 12 MW power plant to support critical operations at a top secret government facility. The government will use this power plant as a temporary source of power during major utility upgrades.</description><content:encoded><![CDATA[PI, in conjunction with AlbanCat, is constructing a 12 MW power plant to support critical operations at a top secret government facility. The government will use this power plant as a temporary source of power during major utility upgrades.]]></content:encoded><dc:creator>Lillian,Rivera</dc:creator><pubDate>Mon, 14 Jun 2010 18:53:00 GMT</pubDate></item><item><title>PI Wins Princeton University Commissioning Contract</title><link>http://www.primaryintegration.com/news/default.aspx?ArticleId=107</link><description>PI has won the contract to provide commissioning services for Princeton University’s new High Performance Computing Research Center (HPCRC) in Plainsboro, NJ. The HPCRC will be a 43,000 sf two story computing facility with 12,000 sf of raised floor on a 10-acre parcel. </description><content:encoded><![CDATA[PI has won the contract to provide commissioning services for Princeton University’s new High Performance Computing Research Center (HPCRC) in Plainsboro, NJ. The HPCRC will be a 43,000 sf two story computing facility with 12,000 sf of raised floor on a 10-acre parcel. ]]></content:encoded><dc:creator>Lillian,Rivera</dc:creator><pubDate>Mon, 07 Jun 2010 21:20:00 GMT</pubDate></item><item><title>PI's Commissioning Division Expands in Charlotte</title><link>http://www.primaryintegration.com/news/default.aspx?ArticleId=103</link><description>Primary Integration's commissioning division, based in Charlotte, is expanding! The division will welcome a number of new team members and is moving to a new, larger office to accomodate them. More details to follow. </description><content:encoded><![CDATA[Primary Integration's commissioning division, based in Charlotte, is expanding! The division will welcome a number of new team members and is moving to a new, larger office to accomodate them. More details to follow. ]]></content:encoded><dc:creator>Lillian,Rivera</dc:creator><pubDate>Wed, 26 May 2010 20:04:00 GMT</pubDate></item><item><title>Primary Integration/EDG2 Ranked in Top 500 Design Firms</title><link>http://www.primaryintegration.com/news/default.aspx?ArticleId=102</link><description>Primary Integration/EDG2 has been ranked number 313 in this year's ENR top 500 design firms list!</description><content:encoded><![CDATA[Primary Integration/EDG2 has been ranked number 313 in this year's ENR top 500 design firms list!]]></content:encoded><dc:creator>Lillian,Rivera</dc:creator><pubDate>Wed, 26 May 2010 19:26:00 GMT</pubDate></item><item><title>Join the 7x24 Exchange Washington D.C. Chapter!</title><link>http://www.primaryintegration.com/news/default.aspx?ArticleId=99</link><description>Join the Washington D.C. Chapter of 7x24 Exchange to receive educational presentations, industry updates, free white papers, annual conference discounts, and networking opportunities. To learn more about 7x24, the Washington D.C. chapter, or membership, visit us online at www.7x24DC.org. </description><content:encoded><![CDATA[Join the Washington D.C. Chapter of 7x24 Exchange to receive educational presentations, industry updates, free white papers, annual conference discounts, and networking opportunities. To learn more about 7x24, the Washington D.C. chapter, or membership, visit us online at www.7x24DC.org. ]]></content:encoded><dc:creator>Lillian,Rivera</dc:creator><pubDate>Mon, 05 Apr 2010 16:08:00 GMT</pubDate></item><item><title>NAP of the Capital Region</title><link>http://www.primaryintegration.com/news/default.aspx?ArticleId=109</link><description>Primary Integration, LLC (PI) provided commissioning services for the construction of the second phase of the NAP of the Capital Region (NCR). This 100,000 square foot tier III facility is located approximately 60 miles from the nation’s capital. </description><content:encoded><![CDATA[Primary Integration, LLC (PI) provided commissioning services for the construction of the second phase of the NAP of the Capital Region (NCR). This 100,000 square foot tier III facility is located approximately 60 miles from the nation’s capital. ]]></content:encoded><dc:creator>Lillian,Rivera</dc:creator><pubDate>Mon, 22 Mar 2010 20:30:00 GMT</pubDate></item><item><title>IBM Leadership Data Center</title><link>http://www.primaryintegration.com/news/default.aspx?ArticleId=86</link><description>PI served as the 3rd party commissioning agent for this 120,000 sf Tier IV facility, which was designed to create system redundancies that respond to improved reliability, ease of operation, and human error tolerance, while eliminating single points of failure. Critical systems are supported by UPS  [...]</description><content:encoded><![CDATA[PI served as the 3rd party commissioning agent for this 120,000 sf Tier IV facility, which was designed to create system redundancies that respond to improved reliability, ease of operation, and human error tolerance, while eliminating single points of failure. Critical systems are supported by UPS and emergency power systems with complimentary redundancies built and integrated into all aspects of the infrastructure including architectural, mechanical, and electrical components.]]></content:encoded><dc:creator>Americaneagle,Admin User</dc:creator><pubDate>Mon, 11 Jan 2010 20:19:00 GMT</pubDate></item><item><title>Capital One Knolls Data Center</title><link>http://www.primaryintegration.com/news/default.aspx?ArticleId=85</link><description>As the 3rd party commissioning agent, PI is performing a detailed review of system design and sequence of operations for this project, which is the third separate mission critical data center within the existing mission critical facility. Work provided for this 23,000 sf of raised floor project incl [...]</description><content:encoded><![CDATA[As the 3rd party commissioning agent, PI is performing a detailed review of system design and sequence of operations for this project, which is the third separate mission critical data center within the existing mission critical facility. Work provided for this 23,000 sf of raised floor project includes project drawings, specs, and submittals for critical equipment.]]></content:encoded><dc:creator>Americaneagle,Admin User</dc:creator><pubDate>Fri, 08 Jan 2010 20:32:00 GMT</pubDate></item></channel></rss>