Federal

Primary Integration has extensive experience working with such government entities as the DOD, USACE, NAVFAC, and GSA as well as the intelligence community.  With top secret security clearances and all essential accreditations required by the federal government, we are able to complete the most technically complex projects in any security environment.  Our track record of accomplishments on government projects has resulted in close working relationships with the most active federal contractors and numerous repeat assignments from government clientele.  

Some of our experience includes:

Bureau of Engraving and Printing (BEP), Washington, D.C.
As a subcontractor to Pepco Energy Services, Primary Integration surveyed the existing (manufacturing) process systems and HVAC systems to develop a conceptual design for a Supervisory Control and Data Acquisition System (SCADA).

Central Campus TA-5, Ft. Lee, Virginia
PI provided full life cycle commissioning services for the Central Campus TA-5 project located in Ft. Lee, VA. This project included design phase, construction phase, and post construction phase commissioning services.

Defense Information Systems Agency (DISA) Headquarters, Maryland
PI was awarded the commissioning contract for the $369 million DISA headquarters building located in Ft. Meade, Maryland. The new 1,070,000 sf, multi-story campus facility provides enough space for the relocation of more than 4,200 DISA employees.

GSA ā€“ NIAID, Washington, D.C.
PI provided commissioning services for the 2,000 sf data center located in Rockville, MD, successfully verifying that all systems perform adequately in accordance with the design documentation and intent.

National Geospatial Intelligence Agency ā€“ New Campus East, Virginia
PI is providing mission critical commissioning services to the 2.5 million sf US Army Corp of Engineers NGA-NCE Project. These facilities include a 20 MW central utility plant with full generator back-up which supports approximately 200,000 sf of defense data environments and approximately 1.5 million sf of supporting administrative facilities.

National Institute of Health Building 37 & 49, Maryland
PI provided controls integration services for NIH Building 37 and 49. Each building is approximately 250,000 SF and consists of offices and Labs (Fume Hoods). This building is supplied with Chilled Water, Steam and Compressed Air (process and temperature control) from the Main Power Plant.

National Intrepid Center of Excellence (NICoE), Maryland
PI provided design review and commissioning services for this two-story, 75,000 sf facility which includes medical treatment and research, instructional and auditorium, data environment, and supporting MEP facilities. PI provided full life-cycle commissioning, including design phase, construction phase, and post construction phase commissioning. In addition, PI provided LEEDā„¢ enhanced building commissioning services for the HVAC systems and reliability commissioning to the power systems, which are supported by emergency power and UPS.

U.S. National Archives and Records Administration II, Maryland
PI provided systems integration, upgrade, and energy savings control strategies valued at 1.5 million dollars. The project primarily consisted of upgrading the existing Siemens HVAC control system to an Ethernet based systems throughout the facility.

 